I got them when I was in boy scouts a long time ago. I am currently looking for them now, they show the closing of runway 32L/14R and the opening of the parallel runways that are planned for construction. I also think that the plans called for a new terminal complex where the current UPS and United cargo area is on the south side of the airport. The airport will have 5 parallel runways, 27/9 L,C,R and 28/10 L,C, R.
I was wondering if you would be able to use the maps in the future in order to assist with the development of the airport. If so, I would probably be able to mail them to you. I am looking for them anyway.