Hi y'all,
I wonder is a V3 version of KCLT will be built?
Will definitely be needed as the V2 doesn't reflect pretty well the actual airport.
First of all, there is a bug with the actual scenery:
There is this big bridge on the taxiway betwwen 36L and 36C, plane crash on it when trying to go over it. Should be flat.
For the changes needed to be made:
On those 2 screenshots, the terminals are missing, just an opened area with chelters. Also, all gates on terminal E have jetways now.
This area need to be rearranged as it serves now as taxiways
The new Sullenberger museum is located here, still being built but the hangar is complete (will open in 2024)
All the taxiways between taxiway E17 and gate E39 have been changed. The yellow centerline is still present (for A320/737 and up) but now they have added a blue taxiway centerline and an orange taxiway centerline on each side of the yellow centerline, that permit to have 2 aircraft crossing on different direction (CRJ/ERJ) to increase taxiing efficiency. Also, in order to have 2 aircraft crossing each other on the same taxiway they have decreased the grass area between the terminal E and taxiway C:
Here is an exemple how it is done, all the markings (BLU, ONG and all circle spots ie 31W) as well as the blue/yellow/orange colored lines are painted on the ground in real life.
The new ATC tower is not lighted red on the top but blue starting from the bottom and upward
Last but not least, what about the new terminal T that is being constructed (almost finished, same size and north of terminal A)?
I can provide more details and/or real pictures/data if needed just PM me.